Government of Orissa

Planning & Coordination Department

* * *

No._13590__________/P.,    Bhubaneswar ,    Dated   28.09.2006                                              

              LTAP-128/06

 

R E S O L U T I O N

       

Sub:        The Biju KBK Plan: Modalities and Guidelines.

                With a view to continuing their increasing efforts as well as for maintaining the momentum gathered under the Revised Long Term Action Plan (RLTAP) and upscaling the public investment in the Koraput-Bolangir-Kalahandi (KBK) region, the State Government have launched a new initiative, called "the Biju KBK Plan" under State Plan as a tribute to late Biju Patnaik, former Chief Minister of Orissa who was the first to articulate the need for long-term measures for development of the KBK region.  The rationale, modalities and guidelines for the Biju KBK Plan are as follows:

2.             The KBK Region: Most Backward Region of the Country

 

2.1           The KBK region comprising undivided Koraput (i.e., Koraput, Nawarangpur, Malkanagiri & Rayagada), undivided Bolangir (i.e., Subarnapur & Bolangir) and undivided Kalahandi (i.e., Kalahandi & Nuapada) districts is the poorest and most backward region of the country.  As per the estimates of the 55th round of NSS Survey conducted in 1999-2000, the incidence of rural poverty was as high as 87.14%.  The region also suffers from acute economic, social and gender disparities, and very adverse socio-economic and human development indicators.  The multifaceted deprivation and backwardness of this region are the result of deep-rooted factors or processes that have emanated from a complex mix of geographical, economic and social factors.  This region in general, and undivided Koraput and Kalahandi districts in particular are almost at the bottom of the list of 250 Backward Districts identified under Backward Regions Grant Fund (BRGF).  Therefore, long-term and holistic development strategies are needed to bring this region closer to the other regions of the State, as well as that of the Country.

3.             The Biju KBK Plan: Rationale

3.1           Because of its very adverse socio-economic and human development indicators, the KBK region has for some time past been attracting the attention of Government of India, National Human Rights Commission (NHRC) and the State Government.  The need for long-term measures for speedy development of this region with special attention to removal of poverty and livelihood support was first articulated in early 1990s by late Biju Patnaik, then Chief Minister of Orissa and a Long-Term Action Plan (LTAP) for a period of seven years was submitted by the State Government to Government of India in 1993-94 for their approval.  LTAP was approved and launched in August 1995.  However, the programme did not take off due to inadequate fund flow and major initiatives could not be undertaken.  LTAP was, therefore, modified as Revised Long-Term Action Plan (RLTAP) that was conceived as a comprehensive and long-term special area development plan for a period of nine years from 1998-99 to 2006-07.  The region has been receiving Special Central Assistance (SCA) of Rs.250 crore per year under RLTAP effective from the year 2003-04.  With active support from Government of India and pooling of resources the State Government has been making concerted efforts during the last five years to improve the implementation of RLTAP schemes and accelerate the development process in the KBK districts. 

3.2           The Government of India have also included the KBK districts under National Food for Work Programme / National Rural Employment Guarantee Act (NREGA), and propose to include these eight districts under BRGF retaining the special funding for the region at Rs.250 crore per year.  Though these initiatives are expected to improve conditions in the region to some extent and are, therefore, a step in right direction, however the quantum of funding may not be adequate to take care of special problems and needs of the region.  The major gaps in rural infrastructure like road connectivity, drought proofing, health and education infrastructure, social safety nets etc. act as a drag on the speedy growth and reduction of poverty rates in this region.

3.3           The poverty in this ST & SC dominated region is not only widespread, but is also very severe and of a long duration.  More than 50% of the rural poor in the area are at least 20% or more below the poverty line.  Moreover, tribals of this region are greatly handicapped because of their physical isolation, low human capital  development, poor communication and markets. In his report dated 13th  March 2006 to NHRC, the Special Rapporteur, NHRC has observed, among other things, that "    poverty in the KBK region has to be considered in its specific context by recognizing not only the incidence of poverty as per national norm but also the depth and severity of poverty which distinguishes it from poverty in other parts of the country and calls for special strategies and concerted action like RLTAP.  Considering the importance of the programme and projects taken up under RLTAP and the results of implementation which can be improved further by following the Commission's recommendation regarding monitoring, I request the Commission to recommend to the Government of India a further extension of RLTAP for a period of ten years".

3.4           There is, therefore, a growing realization within the State Government and in Civil Society that the KBK region requires a holistic and long-term development strategy, needing continued, focused attention and greater fund flow over and above normal development inputs coming from the State and the Central Plans so that special problems and needs of this region and those the people are effectively addressed and a serious dent into poverty can be made.

3.5                 Therefore, with a view to maintaining and strengthening the momentum gathered by RLTAP and upscaling the public investment in the KBK region, the State Government have launched a new initiative, called "the Biju KBK Plan" under State Plan as a tribute to late Biju Patnaik who was the first to conceive a Long-Term Action Plan for the KBK region.  The Biju KBK Plan is to be implemented over a period of 5-years effective from the year 2007-08 to 2011-2012 and envisages an annual outlay of Rs.120 crore over and above normal plan allocations, and the Special Central Assistance that may be available to the region under the Backward Regions Grant Fund (BRGF). The Biju KBK Plan shall form the part of the Special Area Development Project that has been constituted vide Planning & Coordination Department Resolution No. 4148/LTAP-86/99/P, dated 14.03.2000.

 

 

4.             Objectives of Development Strategies for the Plan

4.1           The objectives of the Biju KBK Plan are as follows:

(i)            Creating opportunities for economic, social and human development for the people in the region, especially the disadvantaged,

(ii)           Accelerating poverty reduction and achieving millennium developmental goals, and

(iii)                Improving the quality of life of the local people and bringing the region at par with other developed regions.

4.2                 In order to achieve the aforesaid objectives, the following strategies would gender the Plan:

(i)                   Building rural infrastructure (e.g., critical roads and bridges, minor irrigation projects, tanks, watershed development, markets and afforestation),

(ii)                 Developing district-specific and sub-district-specific livelihoods support programmes (e.g., agriculture / horticulture development, animal resources, fisheries, afforestation and forest-based enterprises, micro credit support, agro-processing enterprises and other value addition initiatives),

(iii)                Mobilising and empowering the rural poor through SHG, Vana Samarakhan  Samities, Pani Panchayats and  participatory planning,

(iv)               Promoting quality education, employable skills and health programmes taken to the specially distant habitations,

(v)                 Strengthening social security systems (e.g., food security, old age pensions, special nutrition programmes, houses for the rural poor, and other initiatives), and

(vi)               Enhancing development effectiveness through convergence of resources and programmes, efficiency in resource use and improved governance and service delivery.

(vii)              Synthesizing the traditional knowledge available with the communities in all developmental activities and preserve the traditions and culture of the region and make the development process inclusive and pro-poor.

5.             Increased Fund Flow to the KBK region

5.1           Each Development Department is mandated to allocate atleast 30% of their plan funds including funds received by them under Central flagship programmes such as Bharat Nirman, NREGP, and other programmes to the KBK region.

5.2           Government of India shall also be requested to direct Central Ministries to ensure that atleast 30% funds available to the concerned line departments under Central Plan and Centrally Sponsored Plan Schemes are allocated to the KBK region.

5.3           With a view to ensuring convergence of resources and programmes, development funds available from all sources including Central Plan, Centrally Sponsored Plan, State Plan and other flagship programmes such as Bharat Nirman and BRGF shall be taken into account while preparing Annual Action Plans for the KBK region.

5.4          The funds available under the Biju KBK plan shall be used as an additionality to fill critical gaps for which funds are either not available or are inadequate.  The Plan funds may also be used for innovative schemes.

5.5           Specified amount out of available funds shall also be utilized for strengthening District Planning Committees and grass root level planning, and improving the local self governance.

6.             Mechanisms for Implementation of the Plan

6.1           Planning & Coordination Department shall be the Nodal Department for the purpose of Administration of the Biju KBK Plan.

 6.2          The Plan shall be executed in all 8 (eight) KBK districts and shall have two windows: (i) State Window, and (ii) District Window.   The State Window component of the Plan shall be implemented through different line Departments, which will take appropriate budget provisions for this purpose under appropriate heads of account each year.  The District Window component of the Plan shall be implemented under the umbrella of the District Plans and appropriate budget provisions for this purpose shall be taken by P & C. Department.  Each District Collector shall ensure preparation of a District Plan in a specified manner, which shall be examined and consolidated by the District Planning Committee. Grass root level consultation should be part and parcel of the Plan formulation. 

6.3           The Biju KBK Plan shall also fill up critical gaps left uncovered under Backward Regions Grant Fund (BRGF). It shall specifically take up construction of 10,000 buildings for Women Self Help Groups (WSHG) at a cost of Rs. 3 lakh per building within the 11th Five Year Plan. Priority shall also be accorded to hostel buildings for girl children, critical gaps in connectivity such as cross drainage works including culverts and bridges, buildings for Anganwadi centres etc.

6.4           With a view to maintaining a long term perspective and providing a definite direction to the Plan, each district shall prepare a 5 year perspective plan.  The funds available under the District Window should be treated as an additionality for the district Plan.  Each District shall prepare Annual Action Plan which will form the part of the State Annual Plans.  The approval of the State Annual Plan by the State Government as well as the Planning Commission shall be deemed to be the approval of the special plan for the KBK districts.

 6.5          The proposals received under the State Window shall be examined and approved by the Government in P & C. Department.  The approved State Window component shall be implemented by concerned line Departments in the same manner as RLTAP has been implemented.  Funds shall be released under the Biju KBK Plan in not more than two installments by the P & C. Department direct to the concerned Collectors who shall maintain a separate head of account for the Plan with the District  Rural Development Agency (DRDA).  The concerned Project Director, DRDA shall function as Drawing & Disbursing Officer for the District Window of the Plan.

6.6           The line Departments and District Collectors shall release the received funds to the concerned implementing agencies within 15 days of the receipt of funds from the P & C. Department.  The concerned line Departments, District Collectors and Project Directors, DRDA shall be directly responsible for effective and timely implementation of the Plan and shall furnish Monthly Progress Report (MPR) on financial and physical achievements of the Plan to P & C. Department by 10th of the following months.

6.7           The implementation of the Plan shall be periodically monitored and evaluated by District Planning Committees, Planning & Coordination Department and the State Level Committee, constituted for RLTAP.

7.             Preparation of District Plan

7.1           For availing the additional developmental assistance under the Plan, preparation and consolidation of the District Plan by, and strengthening the capacity of, DPC shall be mandatory.  District Plan shall be prepared as per the Guidelines for the District Plan in the 11th 5-year plan as contained in Planning Commission Letter No. 13011/1/2006/SP-Co. dated. 25.8.06 which has been already circulated to all Collectors vide P & C. Department letter No.12189(30)/P, dated.04.09.2006 and in such a manner as may be specified by P & C. Department from time to time.

7.2           The needs and aspirations of Gram Panchayats, Panchayat Samities and Zilla Parishads shall be fully reflected in the District Plan.  DPC shall prioritise the schemes received from different Gram Panchayats, Panchayat Samities and Zilla Parishads and incorporate them in the District Plans in a phased manner.

7.3           The DPC shall also prepare a benchmark survey of key monitoring indicators before the first District Plan is implemented.  The benchmark indicators shall be used for effective monitoring and evaluation of the plan.

7.4.          The main principles which may be taken into consideration for preparation of the District Plan are summerised as follows:

(i)            The flow of funds from all sources namely State Plan, Centrally sponsored schemes, Central Schemes, externally aided projects and funds received from any other source for development purpose are to be aggregated in arriving at the resource availability for District Plan.

(ii)           Funds under the Biju KBK Plan are to be used as additionality for those schemes for which funding from other sources including State Plans, Centrally Sponsored Schemes, Central Schemes and funds received from any other source for development purpose is either not available or is found to be inadequate.

(iii)          The cost effectiveness of all Schemes shall be carefully evaluated so that returns from the funds invested under the scheme are maximized.

(iv)          People’s participation and involvement of PRIs, NGOs, VECs, Pani Panchayats, Self Help Groups and other community based organisations should be ensured at every stage including plan formulation, implementation and monitoring.

(v)           There shall be complete transparency in the choice of schemes and projects and their locations. The prioritized list of schemes and projects and the reasons for taking up the schemes and the criteria for choice of locations must be reflected in the District Plan and be made available on the web-site.  The involvement of Palli Sabha and Gram Panchayats in selection of investment projects is critical.

(vi)          It shall be ensured that the schemes are sustainable and the durable assets are created. Special attention is to be given to sustainability of each project. In the case of community assets, wherever possible future maintenance should be built into the programme, e.g., if a community hall is constructed, individuals who use the hall should be encouraged to pay user fees so that a corpus fund for maintenance can be created.

(vii)         Efforts should be made to concentrate the development activities in poorer pockets and for disadvantaged communities within the district.  It will be mandatory that the District Plan allocates funds for SC communities under the Scheduled Castes Sub-Plan (SCSP) and ST communities under Tribal Sub-Plan (TSP) modes in proportion to their populations in the district.

(viii)        The District Plan shall be on the basis for Development Vision for the district and not be a mere collection of schemes and projects for which funding from existing sources is insufficient.

8.                 Social Audit

8.1           Social Audit and vigilance shall be encouraged at grass-roots level.  The District Collector shall also prepare schedules of inspection which prescribe the minimum number of field visits for each supervisory level functionary and ensure that the inspection schedules are faithfully followed by supervisory level functionaries.  The Government in Planning & Coordination Department may also prescribe additional monitoring and evaluation mechanisms, reports and returns with a view to assessing the effectiveness of the implementation of the Plan from time to time.

9.             Other Matters

8.1           Planning and Coordination Department shall be responsible for clarifying doubts, if any, and ensure that bottlenecks in the implementation of the Plan are removed as expeditiously as possible and communicated to all concerned.

ORDER

It is ordered that the Resolution be published in the Extra Ordinary Gazette of the Government of Orissa for  the general information and copy be communicated to all the Departments of Government / Heads of Department and other concerned.

By order of Governor

 

                                    (R. V. Singh)                   

Special Secretary to Government

 

 

Memo No.__13591 _________/P.,     Bhubaneswar ,          Dated.  28.09.2006

                Copy forwarded to the Director, Printing, Stationary and Publications, Orissa, Cuttack with request to publish the resolution in the next issue of Orissa Gazette and supply 100 copies to the Department.

 

                                                                                                                           Special Secretary to Government

 

Memo No.__13592 (25)____/P., Bhubaneswar ,     Dated.  28.09.2006

                Copy forwarded to the Commissioner-cum-Secretary to Governor, Orissa/ Principal Secretary to Chief Minister, Orissa / Private Secretaries to all Ministers, Orissa for information and necessary action.

 

                                                                                                                            Special Secretary to Government

 

Memo No.___13593 (111)__/P., Bhubaneswar ,     Dated.  28.09.2006 

                Copy forwarded to all Departments of Government / All Heads of the Departments / A.G. (A & E), Orissa, Bhubaneswar for information and necessary action.

 

                                                                                                                            Special Secretary to Government

 

Memo No.___13594 (63)___/P., Bhubaneswar ,     Dated.  28.09.2006

                Copy forwarded to RDC (CD), Cuttack / RDC (ND), Sambalpur / RDC (SD), Berhampur/ All Collectors / All Project Directors, DRDAs for information and necessary action.

 

                                                                                                                        Special Secretary to Government

 

Memo No.__13595 (7)___/P., Bhubaneswar ,     Dated.  28.09.2006

                Copy forwarded to Private Secretary to Chief Minister / Private Secretary to Minister, Planning & Coordination  / Private Secretaries to Chief Secretary / Development Commissioner-cum-ACS / Agriculture Production Commissioner-cum-ACS/ Principal Secretary, Finance /  Special Secretary (Plan), P & C. Departments for favour of information of Hon’ble Chief Minister & Minister, P &C / Chief Secretary / DC-cum-ACS / APC-cum-ACS / Principal Secretary, Finance / Special Secretary (Plan), P & C. Department.

 

                                                                                                                            Special Secretary to Government

 

Memo No.___13596 (40)______/ P.,  Bhubaneswar ,    Dated.  28.09.2006

                Copy forwarded to all Branch Officers / all Sections of Planning & Coordinaton Department for information and necessary action.

                                                                                                                                Special Secretary to Government

 

 

 

Government of Orissa

Planning & Coordination Department

* * *

No._15779  /P.,    Bhubaneswar ,                                                Dated   24th October, 2006                                               

              LTAP-128/06

 

R E S O L U T I O N

       

Sub:        The Biju KBK Plan: Modalities and Guidelines.

                Para 3.5 of this Department Resolution No.LTAP-128/06/13590/P, dated. 28.09.2006 stands amended with immediate effect in the following manner:

3.5                   Therefore, with a view to maintaining and strengthening the momentum gathered by  RLTAP and up-scaling the public investment in the  KBK  region, the State Government have launched a new initiative, called "the Biju KBK Plan" under State Plan as a tribute to late Biju Patnaik who was the first to conceive a Long-Term Action Plan for the KBK region.  It has been decided that the Biju KBK Plan shall be implemented during the  year 2006-07 on pilot basis in a modest manner.  The Biju KBK Plan shall, however, be implemented in a full-fledged manner from the year 2007-08 to 2011-12.   From the year 207-08 onwards, the Plan envisages an annual outlay of Rs.120 crore over and above normal plan allocations, and the Special    Central Assistance that may be available to the region under the Backward Regions Grant Fund (BRGF).  The Biju KBK Plan shall from the part of Special Area Development Project that has been constituted vide Planning & Coordination Department Resolution No.4148/LTAO-86/99/P, dated. 14.03.2000.

2.             Other modalities and guidelines for the Biju KBK Plan as enunciated in this Department Resolution No.LTAP-128/06/13590/P, dated. 28.09.2006 remain unaltered

 

 

ORDER

                It is ordered that the Resolution be published in the Extra Ordinary Gazettee of the Government of Orissa for the general information and copy be communicated to all the Departments of Government / Heads of Department and other concerned.

 

By order of Governor

                                                               

(R. V. Singh)

Special Secretary to Government

 

Memo No.__15780_________/P.,     Bhubaneswar ,          Dated.  24.10.2006

                Copy forwarded to the Director, Printing, Stationary and Publications, Orissa, Cuttack with request to publish the resolution in the next issue of Orissa Gazette and supply 100 copies to the Department.

 

                                                                                                                           Special Secretary to Government

 

Memo No.__15781 (24)____/P., Bhubaneswar ,     Dated.  24.10.2006

                Copy forwarded to the Commissioner-cum-Secretary to Governor, Orissa/ Principal Secretary to Chief Minister, Orissa / Private Secretaries to all Ministers, Orissa for information and necessary action.

 

                                                                                                                            Special Secretary to Government

 

Memo No.___15782 (115)__/P., Bhubaneswar ,     Dated.  24.10.2006

                Copy forwarded to all Departments of Government / All Heads of the Departments / A.G. (A & E), Orissa, Bhubaneswar for information and necessary action.

 

                                                                                                                            Special Secretary to Government

 

Memo No.___15783 (63)___/P., Bhubaneswar ,     Dated. 24.10.2006

                Copy forwarded to RDC (CD), Cuttack/RDC (ND), Sambalpur / RDC (SD),Berhampur  / All Collectors / All Project Directors, DRDAs for information and necessary action.

                                                                                                                        Special Secretary to Government

Memo No.__15784 (7)___/P., Bhubaneswar ,     Dated24.10.2006

                Copy forwarded to Private Secretary to Chief Minister / Private Secretary to Minister, Planning & Coordination  / Private Secretaries to Chief Secretary / Development Commissioner-cum-ACS / Agriculture Production Commissioner-cum-ACS/ Principal Secretary, Finance /  Special Secretary (Plan), P & C. Departments for favour of information of Hon’ble Chief Minister & Minister, P &C / Chief Secretary / DC-cum-ACS / APC-cum-ACS / Principal Secretary, Finance / Special Secretary (Plan), P & C. Department.

 

                                                                                                                            Special Secretary to Government

 

Memo No.___15785 (35)______/ P.,  Bhubaneswar ,    Dated.  24.10.2006

                Copy forwarded to all Branch Officers/ all Sections of Planning & Coordinaton Department for information and necessary action.

 

                                                                                                                   Special Secretary to Government

By Fax / Post

 

Government of Orissa

Planning and Coordination Department

***

No.  6153 (8) /P.,    Bhubaneswar               Dated the   9th  April, 2007

         LTAP-128/2006

From

                                Dr. R. N. Bohidar, IAS

                                Development Commissioner-cum-

                                Additional Chief Secretary.

To

                                The Collector,

                                Koraput / Malkangiri / Nabarangpur /
Rayagada / Bolangir / Subarnapur /
Kalahandi / Nuapada.

 

Sub:-                       Formulation of Action Plan under Biju KBK Plan for the year 2007-08.

Madam / Sir,

 

                                I am directed to say that the Government have been pleased to decide that the plan outlay of Rs.120.00 crore under Biju KBK Plan for the year 2007-08 be distributed among 8 KBK districts at the rate of Rs.1.5 crores per block as given in the following table.

 

Sl No.

Name of the district

No. of  Blocks

Plan outlay  
(Rs. in crore)

1

Koraput

14

21.00

2

Malkangiri

07

10.50

3

Nabarangpur

10

15.00

4

Rayagada

11

16.50

5

Bolangir

14

21.00

6

Subarnapur

06

9.00

7

Kalahandi

13

19.50

8

Nuapada

05

7.50

Total

80

120 .00

 

2.                             It has been decided that  the district-wise plan outlay hereby communicated shall be spent primarily on the schemes / programmes relating to ‘Bijili’, ‘Sadak’ and ‘Pani’ i.e. (i) village / rural electrification including street lighting, (ii) construction of concrete roads within the village or any other form of connectivity and (iii) creation of irrigation / drinking water source.  The objectives of the schemes / programmes should fit into the overall plan for providing concrete road in every village and at least 35% irrigation in every Block.

3.                             The outlay under Biju KBK Plan can also be used as cash component for the above schemes where the wage component is met from other sources.  The project proposals under the plan should be demand based and according to the local needs. 

4.                             It is requested that the Annual Action Plan for each district under Biju KBK Plan for the year 2007-08 may be formulated within the earmarked outlay incorporating schemes / programmes as stipulated above and submitted to this Department in both soft and hard copies at an early date.

 

Yours faithfully,

 

 

Development Commissioner-cum-

Additional Chief Secretary

 

Memo No.  6154 (3) /P.,                      dated  09-04-2007

                                Copy forwarded to Chief Administrator, KBK, At/P.O./Dist. Koraput / Deputy Chief Administrator-cum-RDC (SD), At/P.O. Berhampur, Dist. Ganjam / Deputy Chief Administrator-cum-RDC(ND), At/P.O./Dist. Sambalpur for information and necessary action

 

Joint Secretary to Government

 

Memo No.  6155 (16)  /P.,                  dated  09-04-2007

                                Copy forwarded to Project Director, DRDAs of KBK Districts / District Planning Officers of KBK Districts for information and necessary action.

 

 

Joint Secretary to Government

 

Memo No.__6156 (2)/P.,                    dated  09-04-2007

                                Copy forwarded to Plan-I / Budget Section for information and necessary action.

 

 

Joint Secretary to Government

 

 

 

 

 

GOVERNMENT OF ORISSA

PLANNING AND COORDINATION DEPARTMENT

***

 

No.18367 (8)/P.,                    Bhubaneswar Dated the       12th   December, 2007

      LTAP-94/2004(Pt.I)

 

From

 

                                Dr. R. N. Bohidar, IAS

                                Development Commissioner-cum-

                                Additional Chief Secretary &

                                Secretary to Government

To

                                The Collector,

Bolangir/Kalahandi/  Koraput / Malkanagiri /

Nabarangpur / Nuapada / Rayagada /  Subarnapur

 

Sub:-                       The Biju KBK Plan  : Revised Modalities and Guidelines

 

Madam / Sir,

                               

                                I am directed to say that with a view to maintaining and strengthening the momentum gathered by the Special Plan for the KBK Districts ( i.e., RLTAP ) and up-scaling the public investment in the KBK Region, the State Government have launched vide this Department Resolution No.13590-LTAP-128/2006-P., dated 28th September, 2006 a new initiative under State Plan called "The Biju KBK Plan"  which is to be implemented over a period of 5 years effective from the year 2007-08 to 2011-12 with an envisaged Annual Outlay of Rs.120.00 crore over and above the normal  plan allocations and other public investments in shape of Special Central Assistance (SCA) that may be available to the region as special dispensation. The said Government Resolution covers modalities and guidelines for formulation and implementation of District Action Plans under the Biju KBK Plan.

2.                             With a view to improving the quality of public investment and preparation of the District Action Plans under Biju KBK Plan, the Government prioritized the following three sectors namely:  Bijli (i.e, village / rural electrification and street lighting), Sadak (i.e., construction of culverts, bridges and roads for improving inter-village and intra-village connectivity) and Pani (i.e., creation of irrigation and drinking water sources). The Government further prescribed that the project proposals under the approved sectors should be demand based and according to local needs. Appropriate guidelines in this regard were issued vide this Department letter No.LTAP-128/2006-6153(8)/P., dated 9th April, 2007 to all concerned. 

3.                             A number of clarifications have been sought from various quarters to further simplify   the guidelines and procedures for formulation and implementation of the District Action Plans under Biju KBK Plan. After careful consideration of all such references, the Government have been pleased to effect the following changes in the Biju KBK Plan guidelines with immediate effect to bring greater transparency and competitiveness in selection, execution and implementation of development projects under the Biju KBK Plan. 

(i)        The sectors namely "Pani" (i.e., creation of irrigation / drinking water source) and "Sadak" (i.e., construction of culverts, bridges and roads for improving inter-village and intra-village connectivity) are to be given higher priority keeping the local needs and conditions in view.

(ii)       As regards the sector "Bijli" ( i.e., village / rural electrification and street lighting), the State Government have already launched a new village electrification programme namely  "Biju Grama Jyoti Yojana" (BGJY). Apart from this, funds in shape of Central Assistance are also expected to be available under "Rajiv Gandhi Gramya Vidyutkaran Yojana" (RGGVY) for rural electrification programmes.  Therefore, the sectors ‘Pani’ & ‘Sadak’ may be given higher priority than programmes under ‘Bijli’ while identifying projects and allocating funds. 

(iii)      The Biju KBK Plan funds should not be spread very thin. The  infrastructure projects particularly those for culverts, bridges, roads and irrigation should be  identified for inclusion under the Biju KBK Plan keeping in view their development impact.  The estimated cost of such projects should not ordinarily be less than Rs.5.00 lakh.

                    (iv) All projects worth Rs.1.00 lakh and above should be executed through open competitive tenders.  In case, no tender is received for a project, the works may be executed Departmentally in accordance with the provisions contained in OPWD Code.

4.                             It is requested that these revised guidelines may be given wide publicity among different stakeholders and be scrupulously adhered to at the time of formulation and implementation of District Action Plans under the Biju KBK Plan.  All project implementing / executing agencies and the members of the District Planning Committees may be informed  of the revised guidelines for the Biju KBK Plan hereby issued. 

Yours faithfully,

 

Development Commissioner-cum-

Additional Chief Secretary &

Secretary to Government

 

Memo No.18368/P.,                                                                    dated    12.12.2007

                                Copy forwarded to all Departments for information and necessary action.

 

Joint Secretary to Government

 

Memo No.18369/P.,                                                                    dated 12.12.2007

                                Copy forwarded to the Chief Administrator, KBK, At/P.O./Dist. Koraput / Deputy Chief Administrators and Ex-Officio Revenue Divisional Commissioners, (Southern Division, Berhampur, Ganjam) & (Nothern Division, Sambalpur) for information and necessary action.

 

Joint Secretary to Government

 

Memo No.1837/P.,                                                                   dated 12.12.2007

                                Copy forwarded to Project Director, DRDAs of all KBK districts / District Planning Officers, all KBK districts for information and necessary action.

 

Joint Secretary to Government

 

 

 

D:6\LTAP\94-04(Pt-I)-letter.doc

 

 

 
GOVERNMENT OF ORISSA

PLANNING AND COORDINATION DEPARTMENT

***

No._________________/P.,   Bhubaneswar Dated the                         February, 2008

      LTAP-94/2004(Pt.I)

 

From

 

                                Dr. R. V. Singh

                                Special Secretary to Government.

To

                                The Collector,

Bolangir/Kalahandi/  Koraput / Malkanagiri /

Nabarangpur / Nuapada / Rayagada /  Subarnapur

 

Sub:-                       The Biju KBK Plan  : Revised Modalities and Guidelines

 

Madam / Sir,

                               

                                I am directed to say that with a view to bringing greater transparency and competitiveness in selection, execution and implementation of development projects under Biju KBK Plan, a set of revised  modalities and guidelines were issued vide Government in Planning and Co-ordination Department letter No.18367 (8)/P., dated 12.12.2007. The provisions contained in para-3(iv) of the letter under reference have apparently posed some operational problem in implementation for  the field level agencies and have affected the progress of implementation of the approved programmes / projects under Biju KBK Plan.  A number of suggestions have also been received from various quarters to further simplify the guidelines and procedures for implementation of District Action Plans under Biju KBK Plan. 

2.                             After careful consideration of all such references, the Government have been pleased to bring out certain amendments in  the Biju KBK Plan Guidelines with immediate effect.  The provisions contained in para -3(iv) of the above referred letter are substituted with the following :

Projects worth Rs.5.00 lakh (Rupees five lakh) and above should be executed through open competitive tenders. In case, no tender is received for a project, the works may be executed departmentally in accordance with the provisions contained in OPWD Code or in the Code(s) of other Development Departments, as the case may be. The projects which are assigned to Blocks and are not executed through tender process, may be executed through the Village Level Leader (VLL) route or any approved method in force.”

3.                             All other contents of the Revised Guidelines issued vide  this Department letter under reference, however, remain unchanged.

4.                             It is requested that these revised guidelines may be given wide publicity among different stakeholders and be scrupulously adhered to at the time of implementation of District Action Plans under the Biju KBK Plan.  All project implementing / executing agencies and the members of the District Planning Committees may be informed of the revised guidelines for the Biju KBK Plan hereby issued. 

Yours faithfully,

 

 

Special Secretary to Government

 

Memo No._______________/P.,                     dated

                                Copy forwarded to all Departments for information and necessary action with reference to this Department memo No.18368(40)/P., dated 12.12.2007.

 

Joint Secretary to Government

 

Memo No._______________/P.,                     dated

                                Copy forwarded to the Chief Administrator, KBK, At/P.O./Dist. Koraput / Deputy Chief Administrators and Ex-Officio Revenue Divisional Commissioners, (Southern Division, Berhampur, Ganjam) & (Nothern Division, Sambalpur) for information and necessary action with reference to this Department memo No.18369(3)/P., dated 12.12.2007.

 

 

Joint Secretary to Government

 

Memo No._______________/P.,                     dated

                                Copy forwarded to Project Director, DRDAs of all KBK districts / District Planning Officers, all KBK districts for information and necessary action with reference to this Department memo No.18370 (16)/P., dated 12.12.2007.

 

.

Joint Secretary to Government

 

 

 

 

 

 

 

 

 

 

Government of Orissa

Planning & Co-ordination Department

 

No.    9211 (8) /P.,                           Bhubaneswar , dated the 18.6.2008

          B.KBK.P-9/2007

 

From

                        Dr. R.V.Singh

                        Special Secretary to Government

To

                        The Collector & District Magistrate,

                        Bolngir / Kalahandi / Koraput / Malkangiri / Nawarangpur / Nuapada /

                        Rayagada / Subarnpur.

 

Sub:-              The Biju KBK Plan: 2008-09 – Modalities & Guidelines.

 

Madam/Sir,

                        I am directed to say that with a view to maintaining and strengthening the momentum gathered by the Special Plan for the KBK districts (i.e., RLTAP) and upscaling the public investment in the KBK region, the State Government have launched vide this Department Resolution No.13590/P., dated 28.09.2006, a new initiative under the State Plan called: Biju KBK Plan which is being implemented from the year 2007-08 with an outlay of Rs.120 crore over and above the normal plan allocations and other public investments in shape of Special Central Assistance.  The aforesaid Government Resolution covers modalities and guidelines for formulation and implementation of the Biju KBK Plan.  Further, modifications in the aforesaid modalities and guidelines were effected vide this Department letter No. 18367 (8) dated 12.12.2007 read with this Department letter No.2890 (9) dated 26.02.2008 that are also currently in force.

2.                     The Biju KBK Plan during 2007-08 was implemented as a District Sector Scheme. However, Government have been pleased to decide that effective from the year 2008-09, the Biju KBK Plan shall be implemented partly as State Sector Scheme and partly as District Sector Scheme.  It has been further decided that 2/3rd resources ,i.e., Rs.80 crore have been earmarked under State Sector and Rs.40 crore have been earmarked under District Sector with the following district-wise break up:

 

Sl.No.

Name of the districts

Biju KBK allocation (Rs. in crore)

State Sector

District Sector

Total

1

Bolangir

14.00

7.00

21.00

2

Kalahandi

13.00

6.50

19.50

3

Koraput

14.00

7.00

21.00

4

Malkangiri

7.00

3.50

10.50

5

Nawarangpur

10.00

5.00

15.00

6

Nuapada

5.00

2.50

7.50

7

Rayagada

11.00

5.50

16.50

8

Subarnapur

6.00

3.00

9.00

Total

80 .00

40 .00

120 .00

 

Procedure for Prioritization and Selection of the Projects:

3.                     The following procedure will be followed for prioritization and selection of sectoral projects under the Biju KBK Plan:

                        (i)        Bijli, Sadak and Pani continue to be the priority sectors under the Biju KBK Plan. However, other need based projects or programmes may also be undertaken under the Biju KBK Plan.

                        (ii)       Incomplete projects should be taken up for completion on priority basis.

(iii)       Under the Sadak Sector, high priority should be accorded to bridges and culverts to ensure round the year connectivity.  However, new road projects may also be taken up within a village or connecting different villages to growth centres and service centres.

                        (iv)  Under Pani Sector, lift irrigation projects and projects covered under the Biju Krishi Vikas Yojana should be given high priority. Projects under Minor Irrigation (Flow) projects, check dams and diversion weirs may also be taken up. Blocks which have less than 35% irrigation should be given high priority.

(v)  Rural Drinking Water projects may also be covered under the following circumstances:

(a) Creating drinking water sources in habitations / villages outside the norm prescribed for KBK districts under the Accelerated Rural Water Supply Scheme.

(b) Addressing Special Problem Areas and filling vital gaps.

                        (vi)  As the Central Scheme: RGGVY and the State Scheme: BGJY are already in operation, allocation of funds for Bijli Sector should receive a low priority. Projects for street lighting, energization of lift irrigation points and projects in those habitations that are not covered under BGJY and RGGVY may be taken up under the Biju KBK Plan.

(vii)        Other infrastructure projects or special need projects may also be taken up as per local demand.

(viii)      Allocation of funds under the Biju KBK Plan should not be spread very thin. Projects should be selected for inclusion under the Biju KBK Plan keeping in view their visible development impact.  Projects of value less than Rs. 5 lakh may not generally be taken up.  Once a project is identified and its cost has been reasonably estimated, efforts should be made to complete the project within the same year or the next year.  This will be possible, if adequate amount of funds are allocated for the approved projects.

(ix)          The projects under District Sector shall be identified by the concerned District Collector in consultation with people’s representatives and concerned district level officers.  Such projects shall form part of District Plan and shall have the approval of the District Planning Committee. After the District Sector Projects are approved by the District Planning Committee, the same shall be forwarded to this Department for Government approval.

(x)            The projects under State Sector may also be recommended by the concerned District Collectors in consultation with people’s representatives and concerned district level officers as well as by the concerned line Departments.  The projects received from the District Collectors and concerned Departments shall be examined in this Department and submitted for Government approval.  The projects under the State Sector shall not route through District Planning Committee.

4.                    It is, therefore, requested that these revised guidelines may be given wide publicity among different stakeholders and be scrupulously adhered to at the time of selection, formulation and implementation of projects under the Biju KBK Plan. All project implementing / executing agencies and the members of the District Planning Committees may be informed of the revised guidelines for the Biju KBK Plan

5.                    It is further requested that development projects may be identified under the District Sector for inclusion under the District Plan.  Projects may also be recommended to be funded under the State Sector.  A list of projects identified under the District Sector and State Sector may be communicated to this Department at a very early date without waiting for the approval of District Planning Committee for projects covered under the District Sector.

         

 

 Yours faithfully,

Sd/-

Special Secretary to Government

Memo No.9212 (9) /P.,                                               Bhubaneswar  dated the 18.6.2008

                Copy forwarded to Principal Secretary / Secretary to Government, Water Resources Department / R.D.Deartment / S.T & S.C Development Department / H & U.D. Department / Health & F.W. Department / W & C.D. Department / Panchayati Raj Department / Works Department / Energy Department for favour of information and necessary action.  They are requested to submit their projects under State Sector of the Biju KBK Plan to this Department for further follow up action.

Sd/-

Special Secretary to Government

Memo No.9213 (3) /P.,                                               Bhubaneswar dated the 18.6.2008

                Copy forwarded to the Chief Administrator, KBK, Koraput / R.D.C. (SD), Berhampur / R.D.C. (ND), Sambalpur for information and necessary action. 

Sd/-

Special Secretary to Government

Memo No.9214 (8) /P.,                                               Bhubaneswar dated the 18.6.2008

                        Copy to Project Director, DRDA, Bolngir / Kalahandi / Koraput /      Malkangiri / Nawarangpur / Nuapada / Rayagada / Subarnpur for  information and necessary action. 

Sd/-

Special Secretary to Government

Memo No.9215 (8) /P.,                                                Bhubaneswar dated the 18.6.2008

                Copy to District Planning Officer, Bolngir / Kalahandi / Koraput /     Malkangiri/ Nawarangpur / Nuapada / Rayagada / Subarnpur for  information and necessary action. 

Sd/-

Special Secretary to Government